One Person Operator (OPO) project

Client: London Underground

The OPO contract covered 33 stations. IPS was responsible for the design and build of the new system.

The new OPO system included the installation of up to eight CCTV cameras on each platform, a microwave link to the train, platform based and track base electronics equipment and all associated cable infrastructure.
A comprehensive regime of testing and commissioning is conducted to confirm the image quality and operational functionality.
As part of an IPS initiative to improve communications and document control, IPS has introduced the latest version of its Project and Site Documentation control system. This allows real time on-line access via tablet devices to a wide range of relevant documentation.